Heavy duty railway ferry bogie can be installed with variable voltage device
Many companies require wireless handles and transformers when buying a heavy duty railway ferry bogie. How do you install them correctly? The following is a brief introduction of the heavy duty railway ferry bogie.
Wireless control handle: Mainly composed of wireless transmission equipment and wireless receiving equipment. At the time of purchase, the ordinary manufacturer's track flat car products should be used. Eliminating the goods will result in insensitivity or failure of reception. Once the purchase is complete, the installation will begin. First, the launching device is mounted on an electrical device.
On the heavy duty railway ferry bogie, you need to pay attention to the heavy duty railway ferry bogie with reserved wireless PCI interface. If you do not need to install the PCI conversion interface on the computer motherboard of the track flat car and update the motherboard drive at the same time, then buy the heavy duty railway ferry bogie, It is time to pay attention to whether the interface is retained. After installing the water supply unit, tighten the fixing screws on both ends of the motherboard. At this time, start the heavy duty railway ferry bogie, select the wireless control on the control platform, and import the driver of the transmitter, then you can, and then test the processing of the wireless controller, if not, it is not inserted or the driver is not match.
Installation of a variable voltage device for a heavy duty railway ferry bogie: This is actually very simple. When purchasing, the size of the transformer is mainly considered. The voltage box size of the heavy duty railway ferry bogie can be installed with the same power. When docking, the red wire of the transformer is connected to the positive pole, the black wire is connected to the negative pole, the yellow wire is grounded, and the surrounding foam is placed to reduce the vibration of the car caused by the operation of the heavy duty railway ferry bogie, and the heavy duty railway ferry bogie begins to check the operation.